TEST EXECUTION AUTHORIZATION FORM (TAF) 1 SUBJECT TEST

INSIDE INFORMATION EXECUTION OF AGREEMENT ON CONSTRUCTION
1 BUDGET EXECUTION OVERVIEW 11 ROLE OF THE GOVERNMENT
1ST LETTER REQUESTING EXECUTION OF LEASE AGREEMENT (CAPTION) (ADDRESSEE)

A COORGANIZING VIEW OF THE IMPACT OF VARIANT EXECUTIONS
ACCORDING TO NOTIFICATION OF CERTAIN PROVISIONS OF LABOR EXECUTION
AMEND SECTION 103 AWARD AND EXECUTION OF CONTRACT

Modulo TAF

TEST EXECUTION AUTHORIZATION FORM (TAF) 1 SUBJECT TEST

Test Execution Authorization Form (TAF)












1. SUBJECT

Test :


Unit Under Test - P/N:


Laboratory:


2. REFERENCES

Quality Plan N°:


Issue:


Technical Spec. N°:


Issue:


Test Proposal / Plan Document N°:


Issue:


Test Bench/rig Document N°:


Issue:


Instrumentation File N°:


Issue:


…………………………….


Issue:


3. DECLARATION

The configuration of the test article is in conformity with the requirements of the document in [3];

the certificate of conformity is enclosed in Annex A.

TTEST EXECUTION AUTHORIZATION FORM (TAF) 1 SUBJECT TEST he TAC has been satisfactorily completed and is enclosed in Annex B.

When the TAC report is missing or not completed, refer to the Sheet II.

Any non-conformity discovered on the test article has been evaluated and approved; the applicable documents are enclosed in Annex C.


TTEST EXECUTION AUTHORIZATION FORM (TAF) 1 SUBJECT TEST he instrumentation required by the Document in [3] and listed in the Document in [5] is suitable for correct acquisition of the required parameters.

TEST EXECUTION AUTHORIZATION FORM (TAF) 1 SUBJECT TEST

The test bench / Rig is compliant with the document in [3] / [4].


The Laboratory


is suitable for performing the test.




Quality Department (of Supplier) / Date


4. REPRESENTATIVENESS

The Test Article identified in [2] / [3] including deviations identified in Annex B is representative to the Type Design and is consistent with the aim of Test Proposal [3].

In particular has been determined that (ref. 21 A.33(b)):

  1. for the test specimen:

  1. that materials and processes adequately conform to the specifications for the proposed type design;

  2. that parts of the products adequately conform to the drawings in the proposed type design;

  3. that the manufacturing processes, construction and assembly adequately conform to those specified in the proposed type design; and

  1. that the test equipments and all measuring equipments described in [3] / [4] / [5] are adequate for the test and are appropriately calibrated; and

As a result, the Test Article is representative and the Test is judged acceptable/adequate for the purpose of showing compliance.


______________________________________________


LH CP Responsible for the test / Date









5. TEST EXECUTION AUTHORISATION

As far as the requirements and procedure reported in the Test Proposal [3] are concerned, having sight of the previous declarations, the Test Article is representative and the Test is judge acceptable/adequate for the purpose of showing compliance (ref. 21 A.33(e)(1)) and therefore  

TEST EXECUTION IS AUTHORISED




LH CVE (Compliance Verification Engineer) / Date


6. ANNEX


Certificate of Conformity N°:


TAC N°:


(or equivalent Document)

Non Conformity Documents N°:


D

…………………………….












7. REMARKS







































Box

Filling Instruction

Title

No.: TAF-(Test Plan No.)-(sequential No.);

Issue: Revision letter;

Date: TAF compilation date.

1

Subject

Test: Title or description of the Test;

Unit Under Test: Test Article P/N;

Laboratory: Name of the Organization performing the Test.

2

References

Include Document number;

Add any other relevant document;

Insert N/A where needed.

3

Declaration

Signature of Quality Responsible of Supplier;

If the Supplier is not the manufacturer of the test item also, the test item conformity section ( first slot in the box) shall not be marked.

4

Representativeness

Signature of LH CP for Laboratory / Ground Test.

5

Test Execution Authorization

Signature of LH CVE.

6

Annexes

Title and/or document number.

7

Remarks

Include general information on the status of data (conformity check, instrumentation, etc…) to be highlighted for the authorization of the test.





QRS-115-F01 Issue. 04 June 2019

Pagina 3 di 3

Ref: QRS-115



ANSWER TO Q2 PIPELINING SLICING THE INSTRUCTION EXECUTION
CONCURRENT QUERY EXECUTION CONCURRENT QUERY (QUERY1 AND QUERY2) FIRSTLY
CONTRACT ATTACHMENT EXECUTION INSTRUCTIONS FOR CAPACITY BUILDING II


Tags: (taf) 1., (taf), authorization, execution, subject