SECTION 01 29 00 MEASUREMENT AND PAYMENT
GENERAL
RELATED DOCUMENTS
Contract Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
SUMMARY
This Section includes Pay Item descriptions for measurement and payment of Work completed.
DESCRIPTION
General:
NOTE: The Pay Item descriptions listed herein are hypothetical and will vary with each project. Do not prepare pay estimates based on these descriptions.
All measurements and payments will be based on work completed in strict accordance with the Drawings and specifications for the project.
The method of measurement and basis of payment described are for the work itemized in the Bid Form and in the sections of the specifications. Items may include work within a single section or in more than one section.
See the General Conditions for additional information pertaining to measurement and payment. This section is intended to supplement the General and Special Conditions.
[Measurement for the Work will be Lump Sum and all measurements are based on the Contractor’s required quantities to provide the Work as shown in the Contract Drawings.]
[Unless otherwise specified, all longitudinal measurements will be made horizontally, and computations will be based on the dimensions shown in the Contract Drawings and Details. No measurement will be made by weight tickets.]
[Quantities shall be rounded to the nearest whole number.]
[The Contractor shall, in the presence of the Project Manager, verify all measurements and quantities required for payment by the unit price method.]
[The Contractor shall provide necessary equipment, workers, and survey personnel as required for measurements.]
Units:
[Measurement by Volumes: Measurement by cubic dimension using mean length, width and height, or thickness. Longitudinal measurements will be made horizontally.]
[Measurements by Area: Measured by square dimensions using mean length and width or radius, measured horizontally.]
[Linear Measurement: Measured by linear dimension at the item centerline or mean chord.]
[Measured by Lump Sum or Per Each: Item inclusion as specified by the bid item description.]
Payment:
[Payment for Work listed as lump sum bid items completed under this contract shall be paid for on a lump sum fixed price basis.]
[Unit bid prices, as quoted in the Bid Schedule, shall constitute full compensation for labor, materials, equipment, rentals, overhead, profit and incidentals to complete all work for each pay item and for all risk, loss, damage, or expense of whatever nature arising from the nature of the work or prosecution thereof].
[Work or materials that are essential to the Work, but for which there are no pay items, will not be measured and paid for separately, but shall be included in other items of work.]
[Final payment for Work governed by unit prices shall be made on the basis of the measurements and quantities accepted by the Project Manager multiplied by the unit price for work which is incorporated in or made necessary by the Work.]
PRODUCTS (Not Used)
EXECUTION (Not Used)
MEASUREMENT AND PAYMENT
Refer to each specification section for Measurement and Payment information relative to the contents of that section.
END OF SECTION 01 29 00
MEASUREMENT AND PAYMENT
01 29 00 -
January 2021
61303 SECTION 613 ‑ CENTERLINE AND REFERENCE SURVEY MONUMENTS
EPOXY 728 SECTION 728 EPOXY 1 SCOPE 1 MATERIALS
EXECUTIVE OFFICEDIVISION NAME BUREAUDISTRICT OR SECTION NAME PO
Tags: general 1., the general, general, section, payment, measurement