Project Management – Time and Effort Entry (Screen 037) |
|||
Step |
Description |
Other Information |
|
1 |
Access the Project Plan Quick Update screen. Open HSL using the 3270 emulator. Select OIT Project Mgmt from the menu. Tab to SCR and key 037 (screen #) to record time to a task. Press Enter. |
There are two methods for time entry – screens 037 and 038. Screen 038 will be covered separately. Can use F9 to move between screens 037 and 038. |
|
2 |
Record time. Cursor will be at the input line column A. Enter the following: A (for add) Project number Area code Step number Activity code Hours Press Enter. |
Employee must be assigned to a step/task to record time against it.
Cursor will tab as each section is keyed.
Continue until all time is entered. |
|
Enter information from Step 2. Total hours posted for that date. |
|||
3 |
To delete an entry the hours must be zero. Move cursor to hours that need to be changed to zero. Key in with 000.0. Must use a decimal with the zeros. Press Enter. Move cursor to column A of row to be deleted and key in D. Press Enter |
Screen 037 is the only screen that you can delete entries previously recorded to your time. |
|
First zero out time and press Enter. (Step 3) Second, key a D in front of the line to
delete and press Enter. (Step 3) Or to change hours, just key over incorrect
time and press Enter. (Step 4) |
|||
4 |
To change hours: Move cursor to hours that need to be changed. Key in correct time. Press Enter. |
|
|
5 |
To copy an entry: Move cursor to column A of row to be copied and key C. Press Enter. Copied line will appear on the input line. If copying entry for posting to another day, move cursor to date, key in new date, press Enter. Key A (to add). Tab to Activity and key in an activity code. Make corrections to hours if different. Press Enter. |
S
Key date if posting to a different day. |
|
Key C and press Enter. |
Key A, activity code, hours and press
Enter. |
Project Management – Time and Effort Entry (Screen 038) |
||
Step |
Description |
Other Information |
1 |
Access the Project Plan Quick Update screen. Open HSL using the 3270 emulator. Select OIT Project Mgmt from the menu. Tab to SCR and key 038 (screen #) to record time to a task. Press Enter. |
Only time can be entered in using screen 038. All other uses will require screen 037. Can use F9 to move between screens 037 and 038. |
2 |
Use F7 and F8 keys to scroll the list. Tab or click with your mouse on the appropriate step. Tab to the Activity for the step selected and key in code. Tab to Hours and key in time to be recorded. Tab to Date if posting against previous days. Press Enter. |
Screen 038 defaults to current date. To post time against previous days, change date for each entry. To view day’s activity, go to screen 037.
|
|
CHOOSES A COLLEGE PROJECT RUBRIC (FILL IN
REVISION CONTROL INFORMATION PROJECTSHSISCVSUTILITIESARRAYARRAYDOCV