BRIDGE SCOUR MONITORING FORM BRIDGE XXXXX BENCH MARK

12” X 414” BRIDGE PLANK SPECIFICATION HOTDIP GALVANIZED
Teach Engineering Stem Curriculum Lesson Designing Bridges
(UPLOAD FORM IN EBRIDGE) FULL CONNECTION DEACON AND ELDERS

010116 700b301d Bridge Load Rating Calculations and Summary (revised
1 Hotel 1868 1868 Massachusetts Avenue Cambridge ma 02140
10th International Conference on Short and Medium Span Bridges

BRIDGE SCOUR ACTION PLAN

Bridge Scour Monitoring Form


Bridge: XXXXX


Bench Mark: Top of Rail or Curb (select one)



Location: TH XXX over XXXXX River

Readings taken at upstream or downstream face of bridge (select location)



Date/Time


Water Surface

_____ (1)Abut.

Mid-Span 1

Pier 1 (____)(1)

Mid-Span 2

Pier 2 (____)(2)

Mid-Span 3

______ (2)Abut.

Drop(3)

Elev.

Depth

Elev.

Depth

Elev.

Depth

Elev.

Depth

Elev.

Depth

Elev.

Depth

Elev.

Depth

Elev.

Bench Mark Elev.

















Critical Elev.

















Month, Year

Baseline Date

























































































































(1) North/East (2)South/West

(3) Measurement from reference elevation to water surface






11152021 UTILITY FACILITIES ON BRIDGES PAGE 1 OF 1
13 FROM MARKET IMPERFECTIONS TO MARKET FAILURES SOME CAMBRIDGE
2013 TIANJIN NORMAL UNIVERSITY SUMMER PROGRAM AT CAMBRIDGE UNIVERSITY


Tags: bridge scour, of bridge, bridge, scour, xxxxx, monitoring, bench