OKLAHOMA PETROLEUM INFORMATION CENTER CORE AND SAMPLE LIBARARY CORE

(please Submit one Typed Copy) University of Oklahoma Radiation
+STATE OF OKLAHOMA 1ST SESSION OF THE 50TH LEGISLATURE
32 UNIVERSITY OF CENTRAL OKLAHOMA SPRING 2011 HONOR ROLLS

AFRICANIZED HONEY BEES IN OKLAHOMA HISTORY OF THE AFRICANIZED
AUTOSHAPE 2 EBS OKLAHOMA TRAINING MANUAL COR404 ACCOUNTS RECEIVABLE
BEFORE THE CORPORATION COMMISSION OF THE STATE OF OKLAHOMA

Prices Effective September 1, 2005

OKLAHOMA PETROLEUM INFORMATION CENTER CORE AND SAMPLE LIBARARY CORE




OKLAHOMA PETROLEUM INFORMATION CENTER

CORE AND SAMPLE LIBARARY

CORE RESEARCH CENTER

WELL LOGS AND DATA LIBARARY

PUBLICATION SALES

Fee Schedule Prices Effective September 1, 2005

Charge Unit Minimum


Facility Drill Cuttings (Samples) Research

Usage Fees Cubicle 15.00 4 Hrs

Core Research

Table in core research area 20.00 4 Hrs


Meetings / Seminars

Conference Center 75.00 8 Hrs

Conference Room 25.00 8 Hrs


Service Fees Drill Cuttings Samples

Delivered to Cubicle 5.00 Box

Core Delivered to Table 5.00 Box

Core Gamma Data 3.50 Foot

Core Photography

Slab box 7.50 Box

3 ft core box (core remains in box) 3.50 Box

3 ft core box (core removed from Box) 5.00 Box

Close-Up 7.50 ~ 6” Sample

( In addition to the above photography charges, film cost and processing are added)

Photo Copying Letter / Legal . .15 Page

Labor and Clerical 40.00 hour 10.00

Inventory records, printout of search .25 well 5.00


Core cutting and other services

Longitudinal slab 6.25 Ft 15.00

Sample cutting 40.00 Hr 10.00

Plug drilling (water or air) 40.00 Hr 10.00

Liquid Nitrogen, Oil or Brines have additional charges.

Lathe Work 40.00 Hr 10.00

Washing unwashed cuttings 1.00 Interval 5.00


Core and Cutting loan

In-house viewing (delivery and table/cubical charge only )

Out of house viewing 10.00 Box

(for each 30 days or any portion thereof)

Plus shipping charges

Service charge for shipping preparation 25.00 Pallet

Supplies Boxes Calculated @ current replacement cost plus 15% handling charge Drill cutting collection bags Calculated @ current replacement cost plus 15% handling charge

Rental Fees 35 mm Camera 10.00 4 Hrs

Photographic Stand with Strobes 10.00 4 Hrs

Photographic Stand with Photo Flood 5.00 4 Hrs

Ultraviolet light black box 5.00 4 Hrs

Hand held Ultraviolet Light 5.00 4 Hrs

Microscope 10.00 4 Hrs

ZEISS Microscope with Camera 25.00 4 Hrs

Research Bin ( Acid, Water, Rule etc.) 2.50 4 Hrs


CHANGE OF OWNERSHIP FOR PETROLEUM STORAGE TANKS OKLAHOMA CORPORATION
CORE OKLAHOMA COR195 ELM INTERNAL INSTRUCTOR MANUAL
CORE OKLAHOMA HOW TO DOCUMENT ADDITIONAL DATA REQUIREMENTS PERSONAL


Tags: center core, conference center, center, oklahoma, petroleum, information, sample, libarary