MED Estimate - Likely Generation Build Proposals

MED Estimate - Likely Generation Build Proposals

 

Year

Owners/Operators

Location

Fuel Type

MW

2003

Mighty River Power

Rotokawa (expansion)

Geothermal

6

2004

Meridian Energy

Manapouri Efficiency Improvements

Hydro

30

2004

TrustPower

Tararua

Wind

36

2004

Contact Energy

Otahuhu or Whirinaki

Distillate

150-192

 

 

 

 

 

2004

Confidential

Various Projects

Geothermal

22 total

 

 

 

 

 

2005

Meridian Energy

Manapouri Efficiency Improvements

Hydro

20

2005

Genesis Energy

Hau Nui

Wind

8

2005

Tuaropaki Group

Mokai (expansion)

Geothermal

39

2005


Meridian Energy


Manawatu


Wind


83-96


2005

Confidential

Various Projects

Geothermal / Wind

43 total

 

 

 

 

 

2006

Genesis Energy

Huntly - e3p

Gas (CCGT)

360-400

2006

Putauaki Trust

Kawerau

Geothermal

50

2006

Contact Energy

Tauhara

Geothermal

15

2006

Contact Energy

Poihipi Road (Steamfield)

Geothermal

20

2006

Top Energy

Ngawha II

Geothermal

20

 

 

 

 

 

2006

Confidential

Various Projects

Geothermal / Hydro

30 total

 

 

 

 

 

2007

Confidential

Various Projects

 

440 total

 

 

including coal, geothermal, hydro,

 

 

 

 

hydro-irrigation and wind

 

 

 

 

 

 

 

2008

Meridian Energy

Project Aqua - Stage 1

Hydro

285

 

 

 

 

 

2008

Confidential

Various Projects

Gas Cogen / Hydro /

122 total

 

 

 

Geothermal

 

 

 

 

 

 

2009

TrustPower

Wairau (Marlborough)

Hydro-Irrigation

115

 

 

 

 

 

2011

Confidential

 

Geothermal

50

2012

Meridian Energy

Project Aqua - Stage 2

Hydro

285

 

 

 

 

 

2012

Confidential

 

Hydro

80


 

 

 

 

Notes:

 

 

Some options have not been included in this table because they are mutually exclusive to those shown.

Not all these options will progress to development, and some timings for development are estimated.

The Year refers to the year in which the plant would be available for winter generation.

This list represents data available at 8/5/03 and is subject to ongoing change.





A4108 (2R) 3 LEGISLATIVE FISCAL ESTIMATE [SECOND REPRINT] ASSEMBLY
ADDITIONAL FILE 4 – ESTIMATED PATSER ERROR RATE FOR
AEAT 5231 ISSUE 2 ESTIMATED BENZENE CONCENTRATIONS IN


Tags: build proposals, likely, generation, ownersoperators, build, estimate, proposals