SECTION 640 ‑ LINED DRAINAGE DITCH


Make the following amendments to said Section:


(I) Amend 640.04 Method of Measurement by revising the first and second paragraphs:


"640.04 Method of Measurement. The Engineer will not measure the lined drainage ditch for payment."


(II) Amend 640.05 Basis of Payment as follows:


Amend the first paragraph to read as follows:


"640.05 Basis of Payment. The Engineer will pay for the accepted lined drainage ditch on a lump sum basis complete in place."


Amend the last paragraph to read as follows:


"The Engineer will make payment under:


Pay Item Pay Unit


Lined Drainage Ditch (_____ L.F.) Lump Sum”


The Engineer will not make additional lump sum payment due to overruns or underruns in comparison with the estimated quantity shown in the proposal. The Engineer will make additional lump sum payment only if the Engineer specifies an alteration in the work.”






END OF SECTION







(Project No.)

640-1a 2/20/03


61303 SECTION 613 ‑ CENTERLINE AND REFERENCE SURVEY MONUMENTS
EPOXY 728 SECTION 728 EPOXY 1 SCOPE 1 MATERIALS
EXECUTIVE OFFICEDIVISION NAME BUREAUDISTRICT OR SECTION NAME PO


Tags: ditch make, drainage ditch, following, ditch, section, drainage, lined