GP9P 22 SVQ IN NETWORK CONSTRUCTION OPERATIONS (WATER)

 NETWORKERS AND THEIR ACTIVITY IN INTENSIONAL NETWORKS
EMA5718982015 ENPREMA NETWORKS FUNDING SOURCES BACKGROUND AN ENPREMA
SCALABLE NETWORKING ELIMINATING THE RECEIVE PROCESSING BOTTLENECK—INTRODUCING RSS

3 SECURITY IN WIRELESS AD HOC NETWORKS
DRAFT ACTS 1224 CHURCHES MISSION CHURCH NETWORK
GP9P 22 SVQ IN NETWORK CONSTRUCTION OPERATIONS (WATER)

 GP9P 22 SVQ IN NETWORK CONSTRUCTION OPERATIONS (WATER)

GP9P 22

SVQ in Network Construction Operations (Water) — Service Layer at SCQF level 5



To attain the qualification candidates must complete nine units in total. Candidates following the Service Layer (Distribution) route must complete an additional mandatory unit.


The SVQ also includes a number of additional units. Candidates may complete any of the additional units; however, they do not contribute to the achievement of the full SVQ.



Please note the table below shows the SSC identification codes listed alongside the corresponding SQA unit codes. It is important that the SQA unit codes are used in all your recording documentation and when your results are communicated to SQA.


Mandatory units: Candidates must complete all nine units from this group

SQA code

SSC code

Title

SCQF level

SCQF credits

J2TK 04


EUSMUNC4

Work in an Efficient and Effective Way in the Utilities Sector

5

4

J2TL 04


EUSMUNC10

Maintain a Safe and Secure Working Environment in Utilities Network Construction

5

3

J2TM 04


EUSMUNC3

Work with Other People in the Utilities Sector

5

5

J2TN 04


EUSMUNC5

Determine and Manage Equipment for Safe Working on Sites

5

3

J2TP 04


EUSMUNC6

Locate and Avoid Supply Apparatus for Utilities Network Construction

5

4

J2TR 04


EUSMUNC7

Excavate and Maintain Holes and Trenches for Utilities Network Construction

5

5

J2TS 04


EUSMUNC9

Operate Powered Tools, Equipment and Small Mobile Plant for Utilities Network Construction

5

5

J2TT 04


EUSWNC12

Joint Materials by Mechanical Means on Water Networks

5

5

J2TV 04

EUSWNC9a

Install Engineering Products or Assets for Water Network Construction (Water Services up to 50 mm NB (63 mm PE)

5

5

Distribution route: Candidates following the distribution route must also complete the following unit

J2TW 04


EUSWNC5

Set Out, Operate and Remove Signing, Lighting and Guarding for Highway Works

5

5



Additional units: Candidates may also complete any of the additional units below, however they do not contribute to the achievement of the full SVQ

SQA code

SSC code

Title

SCQF level

SCQF credits

J2TX 04


EUSMUNC8

Reinstate Excavation and Pavement Surfaces After Network Construction Operations

5

5

J2TY 04


EUSWNC11

Joint Materials by Electrofusion Processes on Water Networks

5

5

J2V0 04


EUSWNC10

Restore Water Network Components to Operational Condition

5

4

J2TG 04

EUSWSD10

Communicate with Customers in the Utilities Sector

6

6


GP9P 22, SVQ in Network Construction Operations (Water) Service Layer at SCQF level 5 2


IRISH NATIONAL TIDE GAUGE NETWORK (INTGN) ACTIVE NODES
PURENETWORK MEETING IN COPENHAGEN 2829 JANUARY 2008
THE NETWORK OF INSTITUTES AND SCHOOLS OF PUBLIC


Tags: (water) —, operations (water), operations, network, (water), construction