GP9P 22 |
SVQ in Network Construction Operations (Water) — Service Layer at SCQF level 5 |
To attain the qualification candidates must complete nine units in total. Candidates following the Service Layer (Distribution) route must complete an additional mandatory unit.
The SVQ also includes a number of additional units. Candidates may complete any of the additional units; however, they do not contribute to the achievement of the full SVQ.
|
Please note the table below shows the SSC identification codes listed alongside the corresponding SQA unit codes. It is important that the SQA unit codes are used in all your recording documentation and when your results are communicated to SQA.
Mandatory units: Candidates must complete all nine units from this group |
||||
SQA code |
SSC code |
Title |
SCQF level |
SCQF credits |
J2TK 04
|
EUSMUNC4 |
Work in an Efficient and Effective Way in the Utilities Sector |
5 |
4 |
J2TL 04
|
EUSMUNC10 |
Maintain a Safe and Secure Working Environment in Utilities Network Construction |
5 |
3 |
J2TM 04
|
EUSMUNC3 |
Work with Other People in the Utilities Sector |
5 |
5 |
J2TN 04
|
EUSMUNC5 |
Determine and Manage Equipment for Safe Working on Sites |
5 |
3 |
J2TP 04
|
EUSMUNC6 |
Locate and Avoid Supply Apparatus for Utilities Network Construction |
5 |
4 |
J2TR 04
|
EUSMUNC7 |
Excavate and Maintain Holes and Trenches for Utilities Network Construction |
5 |
5 |
J2TS 04
|
EUSMUNC9 |
Operate Powered Tools, Equipment and Small Mobile Plant for Utilities Network Construction |
5 |
5 |
J2TT 04
|
EUSWNC12 |
Joint Materials by Mechanical Means on Water Networks |
5 |
5 |
J2TV 04 |
EUSWNC9a |
Install Engineering Products or Assets for Water Network Construction (Water Services up to 50 mm NB (63 mm PE) |
5 |
5 |
Distribution route: Candidates following the distribution route must also complete the following unit |
||||
J2TW 04
|
EUSWNC5 |
Set Out, Operate and Remove Signing, Lighting and Guarding for Highway Works |
5 |
5 |
Additional units: Candidates may also complete any of the additional units below, however they do not contribute to the achievement of the full SVQ |
||||
SQA code |
SSC code |
Title |
SCQF level |
SCQF credits |
J2TX 04
|
EUSMUNC8 |
Reinstate Excavation and Pavement Surfaces After Network Construction Operations |
5 |
5 |
J2TY 04
|
EUSWNC11 |
Joint Materials by Electrofusion Processes on Water Networks |
5 |
5 |
J2V0 04
|
EUSWNC10 |
Restore Water Network Components to Operational Condition |
5 |
4 |
J2TG 04 |
EUSWSD10 |
Communicate with Customers in the Utilities Sector |
6 |
6 |
GP9P 22, SVQ in Network
Construction Operations (Water) —
Service Layer at SCQF level 5
IRISH NATIONAL TIDE GAUGE NETWORK (INTGN) ACTIVE NODES
PURENETWORK MEETING IN COPENHAGEN 2829 JANUARY 2008
THE NETWORK OF INSTITUTES AND SCHOOLS OF PUBLIC
Tags: (water) —, operations (water), operations, network, (water), construction