SME 8 (Security) Status Report



Presented by: Simon Blake-Wilson (Sub-Volume 8 SME)



SUMMARY

This paper provides a summary status of PDRs raised against Sub-Volume VIII (Security) of the ATN Technical Provisions.

The Working Group / CCB is invited to approve this report.

1 Introduction

The goal of this paper is to report the current status of Proposed Defect Reports (PDRs) raised against Sub-Volume VIII (Security) of the ATN Technical Provisions.

2 Summary of PDRs

The following table lists all PDRs raised against the Security SV (Sub-Volume 8) since the publication of the Third Edition of Doc 9705.



ID

Class

Title

Status

Last Update


M1030007

E

SV8 errata

RESOLVED


M1030008

C

ASN.1 modification

RESOLVED


M2080001

A

Unnecessary random challenge field

ACCEPTED

2002/12/04

M2080003

C

Clarify representation of AMHS entities

RESOLVED


M2080004

A

Additional extensions in CA certificates

RESOLVED

2002/11/21

M2080005

C

Clarify ATN CRL processing

RESOLVED


M2080006

C

Add warning concerning the use of invalid keys

PROPOSED

2002/10/02

M2080007

C

Remove check result references from 8.6.3

RESOLVED


M2080008

C

Remove duplicate certificate retrieval requirements

RESOLVED


M2080009

A

SV 8 ASN.1

RESOLVED


M2090002

B

SSO-GetCertificatePath target

ACCEPTED

2002/09/23

M2090003

C

ASN.1 padding issues

ACCEPTED

2002/09/23

M2090004

C

SSO-SessionKey certificate knowledge

RESOLVED

2003/01/21

M2090005

C

SSO counter initialization

ACCEPTED

2002/11/28

M2100005

A

Tagging in SV8 ASN.1 module

RESOLVED

2002/12/23



The open PDRs are included in Attachment A.

Of the 5 open PDRs against SV8, it is hoped that 1 can be resolved at this meeting. The remaining 4 have been scheduled for resolution along with the SARPs confidentiality enhancements. Given the delay of the confidentiality work, this decision should be reviewed.



Attachment A – Open PDRs for CCB Discussion