Section 3 Prequalification Response Format
Discipline G-4 Goods Movement Requirements
This activity involves a wide variety of planning studies, technical studies, and projects ranging in size from individual facilities to statewide in scope. These studies and projects can cover all modes of freight transportation, including rail, motor carrier, air cargo, waterborne and intermodal operations. Needs to demonstrate expertise in the technical aspects of each modes individually, and as components of the transportation system as a whole. Needs to demonstrate expertise in the development and application of planning techniques such as travel demand modeling, data collection, highway simulation, facility evaluation, and impact assessments, etc. An ability to relate changes in the operating environment to the corresponding economic, network, and social impacts of such changes is important. Typical studies could include: Routing options for motor carrier shipments; analysis of intermodal capacity issues (both terminal and system-wide); development & redevelopment of port and related logistics facilities; analysis of inland transportation and other operational requirements; and, strategic planning for future investments in the State’s freight transportation infrastructure.
Staff Requirements |
Instructions: List staff that meets requirements. Enclose resume highlighting qualifications, experience, and training certificate (where applicable). |
||
Level A |
|||
Staff level |
Name |
ER |
|
Planner w/ 5 years experience
|
1 |
1. |
Link for Resume is found in Section 2 Page 6 and on PS07 Prequalification Home Page
Firm’s Project Requirements |
Instructions: List the title(s) of projects that meet requirements. Use the link below to report the specifics of the listed projects. Projects must have been completed in the last ten years. |
||
Level A |
ER |
||
One – Project Required |
1. |
Link for Project Detail format is found in Section 2 Page 6 and on PS07 Prequalification Home Page
Page
Prequalification – 1/2006
61303 SECTION 613 ‑ CENTERLINE AND REFERENCE SURVEY MONUMENTS
EPOXY 728 SECTION 728 EPOXY 1 SCOPE 1 MATERIALS
EXECUTIVE OFFICEDIVISION NAME BUREAUDISTRICT OR SECTION NAME PO
Tags: discipline g-4, goods, section, discipline, response, movement, prequalification, format