APPLICATION FOR APPROVAL, UNDER SECTION 14 OF THE CLEAN AIR ACT 1993, OF THE HEIGHT OF A CHIMNEY SERVING PLANT BURNING PULVERISED FUEL OR BURNING SOLID MATTER WITH A BURNING RATE OF 45.4KG PER HOUR OR MORE, OR BURNING LIQUID OR GASEOUS MATTER WITH A BURNING RATE OF 336.4KW OR MORE. |
Name and address of applicant _________________________________________
__________________________________________________________________
__________________________________________________________________
________________________________ Telephone No. ____________________
Address of premises where chimney is or will be constructed (if different from above)
__________________________________________________________________
__________________________________________________________________
_________________________________ Telephone No. ____________________
Name and address of consultant, contractor or other agent (if employed)
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
B. Brief description of proposed works
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
C. Category under which chimney height approval is sought
a) Construction of new chimney Yes/No (delete as appropriate)
b) Increase of combustion space
of existing furnace Yes/No (delete as appropriate)
c) Replacement of furnace by one
having larger combustion space Yes/No (delete as appropriate)
Schedule 2
Particulars of plant/furnace(s) and chimney(s)
A. DESCRIPTION AND USE OF FURNACE(S)
1. Intended use of furnace(s) (e.g. boiler plant, metal melting or re-heating, calcining, drying etc.) (see note 3)
____________________________________________________________
____________________________________________________________
____________________________________________________________
2. Type and description of furnace(s) (see note 3)
____________________________________________________________
____________________________________________________________
____________________________________________________________
3. a) Particulars of furnace(s) to be installed
____________________________________________________________
____________________________________________________________
Particulars of changes intended to existing furnace(s)
____________________________________________________________
____________________________________________________________
c) Particulars of furnace(s) to be removed
____________________________________________________________
____________________________________________________________
B. RATING AND FUEL CONSUMPTION (see note 3)
4. a) Maximum continuous rating of boiler(s) pounds steam per hour from and at 100º C or B.T.U.'s per hour
____________________________________________________________
____________________________________________________________
Maximum rate of fuel consumption in pounds per hour (separately for different fuels
____________________________________________________________
____________________________________________________________
Type(s) of fuel to be used (see note 4)
____________________________________________________________
Sulphur content of fuel (%)
___________________________________________________________
C. PARTICULARS OF EMISSIONS
Efflux velocity of chimney gases at working temperature and at maximum of plant(metres per second) for each chimney applied for
____________________________________________________________
D. PARTICULARS OF BUILDINGS (PLEASE INCLUDE PLANS OR SKETCHES)
Height of building to which each chimney is attached (in metres)
___________________________________________________________
Length of building to which each chimney is attached (in metres)
____________________________________________________________
Height(s) of adjacent building(s) (in metres)
____________________________________________________________
____________________________________________________________
Distance of adjacent buildings from proposed chimney(s) (in metres)
____________________________________________________________
____________________________________________________________
Height of chimney(s) above ground level (in metres)
____________________________________________________________
Details of construction of chimney(s) (materials, insulation, single or multi-flue, internal diameter of chimney top)
____________________________________________________________
____________________________________________________________
____________________________________________________________
E. SUPPLEMENTARY INFORMATION
Brief description and/or sketch plan of other emission sources on the same site including emission source height(s) and approximate distance(s) from the chimney(s) for which approval is sought.
____________________________________________________________
____________________________________________________________
____________________________________________________________
Any other information relevant to the application.
____________________________________________________________
____________________________________________________________
____________________________________________________________
____________________________________________________________
____________________________________________________________
Signed_______________________________ Date______________________________
Name (Block capitals)______________________________________________________
Company Name (if applicable)________________________________________________
Additional sheets or plans may be used to answer questions where required. Please ensure all attachments are numbered and signed and cross referenced.
NOTES 1 - 4
1. An explanatory memorandum on the Clean Air Act 1993, with notes on Section 14, is contained in a Joint Circular (Ministry of Housing and Local Government 69/68, Welsh Office 62/8) available from The Stationery Office.
2. Section 15 of the Clean Air Act 1993 provides as follows:
"If a local authority to whom an application is duly made for approval under this Section fail to determine the application and to give a written notification of their decision to the applicant within four weeks of receiving the application or such longer period as may be agreed in writing between the applicant and the authority, the approval applied for shall be deemed to have been granted without qualification."
3. The information should relate to the total furnace or boiler plant which the proposed chimney will serve after all the works have been completed.
4. If oil, specify type and viscosity, if solid fuel give Coal Board Specification, or colliery source, if known.
Please send all completed approval application forms to:
Mid Devon District Council
Environmental Health Services
Phoenix House
Phoenix Lane
Tiverton
Devon
EX16 6PP
HOMESTART SOUTH & WEST DEVON DESCRIPTION OF THE
JOB DESCRIPTION JOB TITLE HORTICULTURE TUTOR RESPONSIBLE TO DEVON
LICENSING AUTHORITY MID DEVON DISTRICT COUNCIL PHOENIX HOUSE PHOENIX
Tags: clean air, the clean, district, council, clean, devon